Problem

The problem we faced

Three separate systems ran independently, and data was transferred by hand. Customer and order information was inconsistent across systems.

Solution

The approach we developed

We developed an integration layer that manages data flow between systems. Event-based updates, an error queue and retry mechanisms prevented data loss. A monitoring dashboard shows integration health in real time.

Results

Measured gains

−%80Manual data transfer
%99.9Integration availability (example)
3Connected systems
5 monthsProject duration

Process

How did the project progress?

  1. 01

    System analysis

    Data models and flows were documented.

  2. 02

    Architecture

    The integration layer was designed.

  3. 03

    Development

    Connectors and monitoring were developed.

  4. 04

    Migration

    Systems were connected in phases.

Images

Snapshots from the project

Unifying Systems with an Enterprise Integration Platform project image
Unifying Systems with an Enterprise Integration Platform project image

FAQ

About this project

What problem did this project solve?

Three separate systems ran independently, and data was transferred by hand. Customer and order information was inconsistent across systems. An API-based platform that brings ERP, CRM and e-commerce systems together in one integration layer.

Which technologies and methods were used in the project?

The project used technologies and methods such as REST API, Message queue, Monitoring dashboard, Secure authentication, Documentation. The technology choice was based on the project's requirements and the existing systems.

How long did the project take and what were the results?

The project took about 5 months. Key results: Manual data transfer: −%80; Integration availability (example): %99.9; Connected systems: 3. Results are measured by comparing indicators before and after the project.

How is the project scope determined?

After the free initial consultation and analysis, we share the scope, priorities and timeline in writing.

Is phased delivery possible?

Yes. We prepare a phased delivery plan that puts critical functions into operation first.